Reference

Migration of process control systems at existing facilities

A client wants to migrate the old Contronic P process control system to Siemens PCS7 in his wastewater treatment plant. He is commissioning EXCO with:

  • The software projection and visualization with Simatic PCS7 V7.1Configuration of the existing hardware components
  • Network design
  • Interfaces to other controllers
  • Setting up of the system
  • Optimization of the process
  • Coordination / consultations / schedule monitoring

Implementation

With the support of EXCO, the existing basis could gradually be modernized without any breakdown of the system. This was a very large system with lots of participants and there was a major time pressure.


Technology used

Simatic PCS7 V7.1


"EXCO has proven migration knowledge and lots of experience from countless migration projects."

Hans Peter Unhoch, Managing Director, EXCO GmbH

Client

Chemical company, Germany

Your Contact

Werner Plew

Engineering Services

+49 171 275 4907

Back